|
|
|
This is what the original suspension looked like
|
|
|
|
The top spring mount and shock mount
|
|
|
|
Lower spring plate and hole for sway bar link
|
|
|
|
Upper shock mount
|
|
|
|
Lower bump stop
|
|
|
|
|
A-arms removed and bolts with shims
|
|
|
|
Picture from RideTech. This should be the end result!
|
|
|
|
This is the cutout needed to be done (pix RideTech)
|
|
|
|
This is the new lower shock mount. A new bracket needs to be manufactured. This did not come with the kit from RideTech (pix RideTech)
|
|
|
|
New top mount for air bag (pix RideTech)
|
|
|
|
|
Ready to start cutting!
|
|
|
|
This is the cut to be done. I used a cutting wheel. and then cleaned up with an angle grinder.
|
|
|
|
First, the rivets holding the plate to the arm has to be drilled and pressed out. (not easy!)
|
|
|
|
Do NOT remove the ball joint when pressing out the rivets and removing the plate! A big risk that it changes shape!
|
|
|
|
The rivets are out and the a-arms painted and ready to assemble again
|
|
|
|
|
The lower ball joints
|
|
|
|
Metal treated with Fertran to neutralize rust
|
|
|
|
The frame and upper arm cleaned and painted
|
|
|
|
Here are the bags ready to go in
|
|
|
|
Here is the new top bracket for the shock tacked, and the new lower shock bracked mocked up
|
|
|
|
|
Lower shock bracket
|
|
|
|
Lower shock bracket
|
|
|
|
Lower shock bracket
|
|
|
|
Almost ready!
|
|
|
|
Lower shock mount
|
|
|
|
|
Upper shock mount
|
|
|
|
Ready!
|
|
|
|
And the compressor, valves and senders mounted on a board. This will go in the trunk behind the soft top bag
|
|
|
|
Details
|
|
|